人工撒布水泥的施工方法:
Construction method of manually spreading cement:
?、?、水泥用量計算:老路段水泥穩(wěn)定碎石冷再生設(shè)計劑量為5%,密度:2.137 g/cm3 厚度:0.25m 每平米水泥用量:0.25*2.137*0.05*1000=26.7125斤。加寬段水泥穩(wěn)定碎石水泥劑量6%。密度:2.086 g/cm3 厚度0.15m 每平米水泥用量:0.15*2.086*0.06*1000=18.774公斤。
?、?Calculation of cement dosage: The design dosage for cold recycling of cement stabilized crushed stone in the old road section is 5%, with a density of 2.137 g/cm3 and a thickness of 0.25m. The cement dosage per square meter is 0.25 * 2.137 * 0.05 * 1000=26.7125 pounds. The cement dosage for stabilizing crushed stone in the widened section is 6%. Density: 2.086 g/cm3 Thickness: 0.15m Cement dosage per square meter: 0.15 * 2.086 * 0.06 * 1000=18.774 kilograms.
?、?、打布水泥方格:半幅寬度為7.2m+4.58m=11.58m??v向可分2.4*3+2.3*2劃分,根據(jù)每平米水泥用量,老路5%水泥用量布控長度:100/26.7125/2.4=1.56m 即老路5%水泥用量布控為2.4*1.56;老路4.5%水泥用量布控長度:100/24.04125/2.4=1.73m 即老路4.5%水泥用量布控為2.4*1.73;加寬段布控長度:100/18.774/2.3=2.32m;即布控為2.3*2.32。
?、?Laying cement grid: half width of 7.2m+4.58m=11.58m. Vertically, it can be divided into 2.4 * 3+2.3 * 2 sections. According to the cement consumption per square meter, the length of the old road's 5% cement consumption control is 100/26.7125/2.4=1.56m, which means the old road's 5% cement consumption control is 2.4 * 1.56; The length of the 4.5% cement consumption control for the old road is 100/24.04125/2.4=1.73m, which means that the 4.5% cement consumption control for the old road is 2.4 * 1.73; Widening section control length: 100/18.774/2.3=2.32m; that is, the control length is 2.3 * 2.32.
?、?、攤鋪水泥:每個方格放足量合格的水泥兩袋,人工拆開封口,用推板刮勻。布水泥段落長度和冷再生銑刨機速度速度相適應(yīng),一般在冷再生前60-80m,過長水泥將被風(fēng)、或行車產(chǎn)生的氣流刮走而造成損失。
?、?Laying cement: Place two bags of qualified cement in each square, manually open the seal, and use a push plate to scrape evenly. The length of the cement section is adapted to the speed of the cold recycling milling machine, usually 60-80m before cold recycling. If the cement is too long, it will be blown away by the wind or the airflow generated by the vehicle, causing losses.
粉料撒布車的施工方法:
Construction method of powder spreading vehicle:
?、?、水泥運輸車壓力輸入撒布車進(jìn)行裝料。
?、?The pressure input of the cement transport vehicle is used to load the material into the spreading vehicle.
?、啤⒃O(shè)定撒布水泥的寬度和厚度。
⑵ Set the width and thickness for spreading cement.
?、?、進(jìn)行全自動均勻撒布。
⑶ Perform fully automatic and uniform spreading.
本文由 水泥撒布車出租 友情奉獻(xiàn).更多有關(guān)的知識請點擊 http://m.622410.cn/ 真誠的態(tài)度.為您提供為全面的服務(wù).更多有關(guān)的知識我們將會陸續(xù)向大家奉獻(xiàn).敬請期待.
This article is a friendly contribution from a cement spreader rental For more related knowledge, please click http://m.622410.cn/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Stay tuned




























公司地址:濟南市槐蔭區(qū)經(jīng)一路273號群盛華城2號樓1-404
公司名稱:山東途暢路橋工程有限公司
備案號: